31
1
O PER AT I O N , M A I N T EN A N C E , A N D I N S TA L L AT I O N G U I D E
2.5.2 Switching sequence / Automatic
(Closed transition)
2.5.2.1 SOURCE 1 Priority
(SOURCE 2 = Generator)
The switching sequence can be
summarized in the following steps:
1. Activate test on load (HMI or digital
input)
2. Generator start
3. Run engine warm-up timer
4. Pre-transfer S1 to S2 delay
5. Check source synchronization
6. Close SOURCE 2 contacts
7. Open SOURCE 1 contacts, start ETT
timer (parallel mode)
8. Post-transfer S1 to S2 delay
The re-transfer sequence can be summa-
rized in the following steps:
1. Cancel test on load (HMI or digital
input)
2. SOURCE 1 availability timer
3. Pre-transfer S2 to S1 delay
4. Check source synchronization
5. Close SOURCE 1 contacts
6. Open SOURCE 2 contacts, start ETT
timer (parallel mode)
7. Post-transfer S2 to S1 delay
8. Run engine cool down timer
9. Generator stop
Summary of Contents for Zenith ZTS T Series
Page 2: ...2 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 6: ...6 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 10: ...10 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 36: ...36 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 44: ...44 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 106: ...106 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 108: ...108 1 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 122: ...2 122 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 126: ...2 126 ZENITH ZTS D T SERIES 1600 3000 A ZTSCT T SERIES 100 3000 A ...
Page 129: ...129 1 OPER ATION MAINTENANCE AND INSTALL ATION GUIDE ...