ABB | SACE Tmax XT
Management operations | 1 - Putting into service
17 | © 2020 ABB | 1SDH001821A1002 - ECN000135670
Management operations
Life cycle
The following operations are required to ensure that SACE Tmax XT functions correctly:
Reception
Installation
Commissioning
Maintenance
Disposal
Figure 9
Operation
Description
Reception
Unpacking and inspection of materials received
Installation
Assembly operations
Putting into service
General pre-ignition inspections
Maintenance and faults
Routine inspections and cleaning, management of alarms or
faults
Decommissioning
EOL treatment and disposal
This document describes the
Putting into service
and
Maintenance and faults
operations for Ekip Touch;
consult the
Installation Instructions
and
Technical catalog
for the other operations (references on page 4).
1 - Putting into service
Wizard
When powered up, Ekip UP displays the Wizard window, a user-friendly procedure for immediate adjustment
of certain parameters: language, date, time, voltage of the installation, PIN (and RELT Wizard if RELT - Ekip
Signalling 2K-3 module is present).
After the procedure has terminated, the window will no longer appear unless it is reset via Ekip Connect by
the
Reset Wizard
command: in this case, Wizard will appear when the apparatus is powered up the next
time.
NOTE:
for security reasons, ABB strongly advises you to change the PIN right from the first
access and to keep it in a safe place
General checks
Perform the following inspections before putting into service:
Points to be
checked
Checks
Main
connections
Earth connections
If present, connection and tightening to external voltage tap offs
If present, connection of
Ekip Supply
supply/module
Alarm
If Ekip Touch is not on, connect an external supply device (example:
Ekip TT
) to the Trip
unit and make sure there are no alarms present (details on page 19).
Parameters
Configure all the parameters of the unit as required