
Page 2
–6
2104349 rev. AD
2.2.4 Manifold input lines
The following instructions provide the procedural steps to install the manifold. The
meter run manifold high (+) and low (-) pressures t
erminate in the transducer’s
(EXIMV) + and
– differential port cells. The differential port holes are located on
2.2.4.1
Materials not supplied
-
Stainless steel tubing
-
Tubing fittings
A backup wrench should always be used when working with
stainless steel tubing and valves. This prevents the fitting from
turning and/or putting tension on stainless steel tubing.
Figure 2
–4 G4 EX EXIMV ports
2.2.4.2
Step-by-step instructions
1) Install the isolation valves on the meter run.
2) Install the tubing between the meter run and the XFC. It should be noted
that the fittings are not supplied with the unit.
3) Leak check all connections.
Leaks in the tubing or manifold will introduce errors when
calibrating the transducer (EXIMV).
Summary of Contents for XSeries G4 6200
Page 42: ......
Page 61: ...2104349 rev AD Page 2 19 Figure 2 18 G4 EX to UPS ...
Page 62: ......
Page 130: ......
Page 163: ...2104349 rev AD Page 33 ...