![ABB XRC G5 User Manual Download Page 109](http://html1.mh-extra.com/html/abb/xrc-g5/xrc-g5_user-manual_3399269109.webp)
2106026MNAA | XSERIES
G 5
|
109
Figure 10-11: Warm restart with device loader
Click
Help
for more information.
10.4.4
Warm restart from PCCU entry mode
This procedure restarts the device using the System Shutdown/Then reset function from the Station
Setup screen in PCCU. It causes the device to restart with the running (warm) configuration.
The procedure can be performed while on a local or remote PCCU connection.
IMPORTANT NOTE:
This procedure requires Expert view.
To restart the controller using System Shutdown/then Reset:
Connect the PC running PCCU32 to the flow computer.
Launch PCCU32 and click
Entry
.
Click
View
on the PCCU32 menu and select
Expert
from the drop-down list.
Click the top item on the navigation tree. The Station Setup tab displays.
Scroll down to System Startup/Shutdown (
Select
Yes
from the System Shutdown / then Reset drop-down list.
Click
Send
.
Click
OK
to confirm.
Summary of Contents for XRC G5
Page 25: ...2106026MNAA XSERIESG5 25 ...