Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
41
11.
Install two coupling halves (3) on one side of the
drive shaft.
Tighten the hex screws (2) with your fingers.
G004377
12.
Install the drive shaft.
1.
Put the protection tube (8) on the drive shaft.
2.
Install the coupling halves (3) to one bevel
gear.
3.
Tighten the two outer hex screws (2).
CAUTION!
Put the protection tube with the larger
diameter above the smaller protection
tube. This will keep rainwater out of the
protection tubes.
G004394
Torque
10 Nm
13.
Tighten the four hex screws (2).
G004381
Torque
10 Nm
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...