38
Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
17.
Move the protection tubes (8) apart, and tighten
the hose clamps (6).
CAUTION!
Make sure that the slots (9) point
down. This will keep rainwater out of
the protection tubes.
G004388
18.
Put the adhesive caution plate around the
protection tube.
CAUTION!
Do not step on the horizontal drive
shaft. It can bend.
G004389
End of instruction
Procedure for the vertical drive shaft
1.
Make sure that there is a vertical difference of less
than 4° between the spherical shaft-ends.
NOTE!
4° is equal to 70 mm of rise or fall for
every 1000 mm of drive-shaft length.
G004390
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...