Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
3.4 Lifting
3.4.1 Lifting the transport box
Overview
G004307
1
Center of gravity
2
Soft lifting slings
3
Forklift lifting points
Type
Weights
Transport box
Tap-changer
Total weight
VUBB
30 kg
280 kg
310 kg
Procedure
1.
Make sure that the crane is approved for lifting the total weight of the transport box and tap-changer.
Refer to the packing list.
2.
Attach soft lifting slings (2) to the correct locations.
3.
Carefully lift the transport box.
4.
Put down the transport box on a flat surface.
End of instruction
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...