![ABB VUBB Installation And Commissioning Manual Download Page 48](http://html.mh-extra.com/html/abb/vubb/vubb_installation-and-commissioning-manual_5265048.webp)
48
Installation and commissioning guide
1ZSC000562-AAK EN, REV. 2, 2019-07-03
2.
Make sure that the flange of the oil valve fits the
tap-changer.
NOTE!
Dimensions of the O-ring (3).
G004445
3.
Install the oil valve (5), with the O-ring (3).
G004526
4.
Install the pipe (2) on the oil valve (5).
CAUTION!
Make sure that the O-ring (3) is not
damaged, and is correctly installed.
G004447
Torque
49 Nm
Summary of Contents for VUBB
Page 14: ...14 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 28: ...28 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 52: ...52 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 60: ...60 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 68: ...68 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 72: ...72 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 74: ...74 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...
Page 76: ...76 Installation and commissioning guide 1ZSC000562 AAK EN REV 2 2019 07 03 ...