
20
1ZSE 5492-118 en, Rev. 4
fm_00209
4.
Remove the lifting eyes when the on-load tap-changer is in right position on the ”yoke-
fork”.
5. The on-load tap-changer and the transformer is now ready for drying. Follow the in-
structions in chapter 4.
3 Installation in the transformer
Approx. 15 mm
Fig. 10.