WBPEEUI240751C0
PR7 - 1
PR7
AIN-200 Setup
Purpose/Scope
This procedure gives the steps required to set up the AIN-200
block for proper operation. This includes setting jumpers and
switches, and checking for fuses.
Prerequisites
•
Completed worksheet
WS2
.
Parts
None.
Tools
•
Small-tipped, flat-blade screwdriver.
•
Needlenose pliers (optional).
Procedure
□
1. Set the special operations switch SW2 located on the back
of the I/O module to normal operation.
□
2. Determine the block field power and I/O channel require-
ments. Refer to the appropriate worksheet or any other system
documentation available.
□
3. Verify the field power select jumpers J1 and J2 located on
the back of the I/O module are set as shown in Table
PR7-1
.
□
4. Verify 1.6 A, 250 V fuses are present in both the A and B
channel block power fuse holders on the I/O module.
□
5. Verify a 3.15 A, 250 V fuse is present in the field power fuse
holder.
10 min.
8 7 6 5 4 3 2 1
O N
O FF
T00 8 84 A
Table PR7-1. Field Power Select Jumpers
Field Power
J1
J2
Description
IFP
Field power from mounting
column bus
1 2 3
1 2 3
Summary of Contents for Symphony Harmony Series
Page 1: ...Instruction Harmony Series HarmonyInput O utput System I O and Auxiliary Blocks ...
Page 129: ...WBPEEUI240751C0 ...
Page 171: ...WBPEEUI240751C0 ...
Page 221: ...WBPEEUI240751C0 ...
Page 227: ...WBPEEUI240751C0 ...
Page 235: ...WBPEEUI240751C0 ...
Page 261: ...WBPEEUI240751C0 ...
Page 267: ...WBPEEUI240751C0 ...
Page 285: ...WBPEEUI240751C0 ...
Page 289: ...WBPEEUI240751C0 ...
Page 293: ...WBPEEUI240751C0 ...
Page 301: ...WBPEEUI240751C0 ...
Page 309: ...WBPEEUI240751C0 ...
Page 319: ...WBPEEUI240751C0 ...
Page 329: ...WBPEEUI240751C0 ...
Page 335: ...WBPEEUI240751C0 ...
Page 341: ...WBPEEUI240751C0 ...
Page 351: ...WBPEEUI240751C0 ...
Page 367: ...WBPEEUI240751C0 ...
Page 377: ...WBPEEUI240751C0 ...
Page 401: ...WBPEEUI240751C0 ...