7.12.1.2
Setting the station communication
GUID-B77A38F2-1895-4CB3-AB16-961E8A73DAD5 v1
To enable the IEC 61850 communication, the corresponding COM03 ports must be activated.
Port LAN1 A and LAN1 B are used for redundancy.
If COM03 is used; the following below apply. If COM05 is used; there is no redundancy and the
port is named LAN1 or (FRONT)
To enable IEC 61850 station communication:
•
The IEC 61850-8-1 station communication functionality must be configured in the local
HMI. Navigate to Main Menu/Configuration/Communication/TCP-IP configuation/
ETHLAN1_AB and set the
OperationMode parameter to NonRedundant(A) or, for
redundant communication, to
PRP(A+B).
•
To enable GOOSE communication, the
Operation parameter for the corresponding GOOSE
function blocks (GOOSEBINRCV and GOOSEINTLKRCV) must be set to
On in the
application configuration.
•
To enable GOOSE communication via the front port the parameter
GOOSE in Main menu/
Configuration/Communication/Station communication/IEC61850-8-1/PortSelGOOSE
must be set to
Front. To enable GOOSE communication via rear port the parameter
PortSelGOOSE must be set to LAN1.
To enable IEC 61850 station communication:
1.
Enable IEC 61850-8-1 (substation bus) communication for port A and B.
1.1. Set values for ETHLAN1_AB.
Navigate to Main Menu/Configuration/TCP-IP configuation/ETHLAN1_AB.
Set values for
OperationMode, IPAddress and IPMask. OperationMode must be set
to
NonRedundantA.
Check that the correct IP address is assigned to the port.
1.2. Enable IEC 61850-8-1 communication.
Navigate to Main menu/Settings/General settings/Communication/Station
communication/IEC 61850-8-1.
Set
Operation to On and PortSelGOOSE to the port used.
2.
Enable redundant IEC 61850-8-1 communication for port A and B.
2.1. Enable redundant communication.
Navigate to Main Menu/Configuration/TCP-IP configuation/ETHLAN1_AB.
Set values for
OperationMode, IPAddress and IPMask. OperationMode must be set
to
PRP(A+B).
Make sure that the optical fibres are connected correctly.
7.12.1.3
Verifying the station communication
GUID-0B7E64BC-3346-4105-90C0-2EA5A5BB74DE v1
Connect a PC to the substation network and ping the connected IED and the Substation
Master PC to verify that the communication is working up to the transport layer.
The best way to verify the communication up to the application layer is to use a protocol
analyzer connected to the substation or process bus and monitor the communication.
Verifying redundant IEC 61850-8-1 communication
Ensure that the IED receives IEC 61850-8-1 data on both ports A and B. In the local HMI
navigate to Main menu/Tests/Function status/Communication/PRP Status/LAN1–A / LAN1–
1MRK 505 293-UEN B
Section 7
Testing functionality
Breaker protection REQ650
97
Commissioning manual
© Copyright 2013 ABB. All rights reserved
Summary of Contents for REQ650 1.3 IEC
Page 1: ...Relion 650 SERIES Breaker protection REQ650 Version 1 3 IEC Commissioning manual ...
Page 2: ......
Page 12: ...6 ...
Page 20: ...14 ...
Page 28: ...22 ...
Page 40: ...34 ...
Page 42: ...36 ...
Page 116: ...110 ...
Page 123: ...117 ...