![ABB RELION REL670 Installation And Commissioning Manual Download Page 172](http://html.mh-extra.com/html/abb/relion-rel670/relion-rel670_installation-and-commissioning-manual_4707172.webp)
164
Metering
Chapter 11
Verifying settings by secondary
injection
15
Metering
15.1
Pulse counter logic (GGIO)
The test of the pulse counter function requires the Parameter Setting Tool in the PCM or an ap-
propriate connection to a local HMI with the necessary functionality. A known number of pulses
with different frequencies are connected to the pulse counter input. The test should be performed
with settings
Operation = Off/On
and the function blocked/deblocked. The pulse counter value
is then recorded by the PCM or local HMI.
Summary of Contents for RELION REL670
Page 8: ...Contents ...
Page 72: ...64 About this chapter Chapter 9 Establishing connection and verifying the LON communication ...
Page 174: ...166 Remote communication Chapter 11 Verifying settings by secondary injection ...
Page 190: ...182 Maintenance Chapter 13 Fault tracing and repair ...
Page 198: ...190 Glossary Chapter 14 Glossary ...