74 Installation checklist
Mechanical installation
(see
Mechanical installation
on page
49
)
Check that:
The mechanical installation and markings correspond to the system’s layout and design
drawings.
The installation location is properly selected.
There is sufficient free space around the unit (see
Dimension drawing
on page
121
).
The cooling air is able to flow freely (see
Required clearances for cooling
on page
123
).
The ambient operating conditions are allowed (see
Environmental data and requirements
on page
115
).
The inverter is properly fastened to the installation base and secured to mounting plate.
There are no tools, foreign objects or dust from drilling outside or inside of the inverter.
The type labels or the inverters are intact and visible for the user.
The PVS300 user’s guide is situated at the inverter where users can find it.
Electrical installation
(see
Electrical installation
on page
57
)
Check that:
The electrical installation and markings correspond to the system’s wiring diagrams.
The electrical installation and markings correspond to the AC distribution board wiring
diagrams.
The electrical ratings of solar array and other system components are compatible with
inverter.
The solar array and string voltages are not exceeding the nominal input voltage of the
inverter.
The AC line (grid) voltage matches the nominal output voltage (230 V AC) of the inverter.
The DC power cable connections at DC+ and DC- connectors and their locking are OK.
Unused DC input connectors have sealing caps on.
The DC string fuses have adequate nominal ratings (see
DC Input data and solar array
requirements
on page
113
).
There are string fuses inserted in every input of the inverter.
The insulation of the assembly is sufficient. See
Checking the insulation of the assembly
on page
58
.
The inverter has a proper connection to Protective Earth. See
Grounding safety (PE)
on
page
14
.
The AC power cable connections at L, N and PE and their tightening torques are OK. See
AC cabling connection procedure
on page
65
.
The power cables are routed separately from other cables. See
Routing the cables
on
page
58
.
The external control connections to the inverter are OK. See
Connecting the control
cables
on page
66
.
Summary of Contents for PVS300
Page 1: ...ABB solar inverters Product manual PVS300 string inverters ...
Page 4: ......
Page 9: ...Table of contents 9 Further information ...
Page 10: ...10 Table of contents ...
Page 34: ...34 Operation basics and hardware description ...
Page 48: ...48 Planning the installation ...
Page 76: ...76 Installation checklist ...
Page 110: ...110 Troubleshooting ...
Page 120: ...120 Technical data ...
Page 122: ...122 Dimension drawing 3AUA0000094904 ...
Page 123: ...Dimension drawing 123 Required clearances for cooling ...
Page 124: ...124 Dimension drawing ...
Page 126: ...126 Navigation map The navigation map ...
Page 127: ...Navigation map 127 ...
Page 128: ...128 Navigation map ...
Page 130: ...3AUA0000096321 Rev B EN EFFECTIVE 2013 03 14 Contact us www abb com solar ...