![ABB PVS300 Product Manual Download Page 23](http://html.mh-extra.com/html/abb/pvs300/pvs300_product-manual_4153023.webp)
Operation basics and hardware description 23
3
Operation basics and
hardware description
What this chapter contains
This chapter briefly describes the construction, operation and control principle of the
PVS300 string inverter.
Overview
The PVS300 transformerless string inverter converts direct current (DC) generated
by the solar arrays to single phase alternating current (AC). The AC is then fed to
either the public electricity grid or to a load circuit which is connected to the public
electricity grid.
PVS300 is suitable for small and medium-size photovoltaic (PV) systems.
PVS300 is designed for installation in air-cooled outdoor rated enclosures. Installation
is performed with the help of a mounting plate. The DC and AC cable connections at
the inverter are made with quick connectors.
Two variable speed fans operate on a demand basis. A stirring fan prevents the
formation of heat pockets around the control board. A cooling fan provides air flow to
the heat sink and power electronics circuit boards. The fresh air intake for the cooling
fan is located in the cabling section of the inverter. A narrow gap between the inverter
and the mounting plate works as an air vent.
PVS300 provides comprehensive functions for system protection, system supervision
and external communication.
After the inverter has been installed and commissioned, it operates automatically
according to the following principle:
Summary of Contents for PVS300
Page 1: ...ABB solar inverters Product manual PVS300 string inverters ...
Page 4: ......
Page 9: ...Table of contents 9 Further information ...
Page 10: ...10 Table of contents ...
Page 34: ...34 Operation basics and hardware description ...
Page 48: ...48 Planning the installation ...
Page 76: ...76 Installation checklist ...
Page 110: ...110 Troubleshooting ...
Page 120: ...120 Technical data ...
Page 122: ...122 Dimension drawing 3AUA0000094904 ...
Page 123: ...Dimension drawing 123 Required clearances for cooling ...
Page 124: ...124 Dimension drawing ...
Page 126: ...126 Navigation map The navigation map ...
Page 127: ...Navigation map 127 ...
Page 128: ...128 Navigation map ...
Page 130: ...3AUA0000096321 Rev B EN EFFECTIVE 2013 03 14 Contact us www abb com solar ...