![ABB PVS300 Product Manual Download Page 40](http://html.mh-extra.com/html/abb/pvs300/pvs300_product-manual_4153040.webp)
40 Planning the installation
Recommended cable type for remote control unit and I2I interfaces
over EIA/RS-485
Shielded twisted pair (STP) cable (for example Lapp Kabel UNITRONIC
®
LiHCH (TP)
or equivalent) is recommended. These interfaces do not require termination resistors.
The cabling distance is related to the data transfer velocity. The default baud rate for
the remote control unit and I2I link is 19.2 kBit/s.
The approximate cable distance without termination, using twisted pair cable,
24 AWG or conductor diameter of 0.5 mm (0.2 mm
2
) is shown in the following table.
Daisy-chaining of EIA/RS-485 transmission line
Daisy-chain networking topology is reliable and recommended in cases where
several PVS300 inverters are connected to Modbus or I2I over an EIA/RS485
transmission line.
When wiring a daisy-chain network to PVS300 terminals it is recommended to use
suitable crimped end-sleeves (diameter max. 2 mm) to join wires together for reliable
terminal connection.
Baud rate (bits/s)
Distance (m)
1200
1200
2400
1200
4800
1200
9600
1200
14400
1120
19200
840
38400
420
57600
280
115200
140
2
Wire sleeves
Max. Ø 2 mm
Device 1
Dat
a +
Dat
a
-
Gnd_A
3
1
2
Device 2
Dat
a +
Dat
a
-
Gnd_A
3
1
2
Device 3
Dat
a +
Dat
a
-
Gnd_A
3
1
2
Device n
Dat
a +
Dat
a
-
Gnd_A
3
1
Summary of Contents for PVS300
Page 1: ...ABB solar inverters Product manual PVS300 string inverters ...
Page 4: ......
Page 9: ...Table of contents 9 Further information ...
Page 10: ...10 Table of contents ...
Page 34: ...34 Operation basics and hardware description ...
Page 48: ...48 Planning the installation ...
Page 76: ...76 Installation checklist ...
Page 110: ...110 Troubleshooting ...
Page 120: ...120 Technical data ...
Page 122: ...122 Dimension drawing 3AUA0000094904 ...
Page 123: ...Dimension drawing 123 Required clearances for cooling ...
Page 124: ...124 Dimension drawing ...
Page 126: ...126 Navigation map The navigation map ...
Page 127: ...Navigation map 127 ...
Page 128: ...128 Navigation map ...
Page 130: ...3AUA0000096321 Rev B EN EFFECTIVE 2013 03 14 Contact us www abb com solar ...