Troubleshooting 109
2994
I2I power
balancing
param.
mismatch
3-phase monitoring: One of the three
inverters connected together with I2I link has
an incorrect 3-phase monitoring configuration
compared to the other two inverters.
User should check
and compare the 3-
phase monitoring
parameter settings
between all three
inverters connected
together with I2I link.
User should inform the
system supplier about
the warning and
perform corrective
actions according to
their instructions.
2995
Remote
PVS300
faulted
3-phase monitoring: One of the inverters
connected to the AC grid phases is faulty and
has disconnected from the grid. The
remaining operating inverters continue
operation according to the 3-phase
monitoring setup, parameter 75.08, until the
faulty inverter has been serviced.
User should check the
serial number of the
faulty inverter and
immediately contact
the system supplier
about the warning to
organize a service visit
for the faulty inverter.
2996
Remote
PVS300
disconnected
3-phase monitoring: One of the inverters
connected to the AC grid phases has sensed
instability of the 3-phase supply and has
disconnected from the grid. The remaining
operating inverters continue operation
according to the 3-phase monitoring setup,
parameter 75.06, until the unstable phase
becomes functional again.
User should monitor
for 10 minutes or so
whether the inverter
returns to normal
operation
automatically or not. If
not, or if the warning
repeats often, the user
should immediately
contact the system
supplier.
2997
I2I
communicati
on timeout
3-phase monitoring: Communication timeout
of I2I link between 3-phase configured
inverters has occurred. The inverter
continues operation according to the 3-phase
monitoring setup, parameter 75.04.
User should monitor
for 10 minutes or so
whether the inverter
returns to normal
operation
automatically or not. If
not, or if the warning
repeats often, the user
should immediately
contact the system
supplier.
Warning
message
ID code
Warning
message
description
Cause of warning and inverter’s behavior Maintenance or
service person
actions
Summary of Contents for PVS300
Page 1: ...ABB solar inverters Product manual PVS300 string inverters ...
Page 4: ......
Page 9: ...Table of contents 9 Further information ...
Page 10: ...10 Table of contents ...
Page 34: ...34 Operation basics and hardware description ...
Page 48: ...48 Planning the installation ...
Page 76: ...76 Installation checklist ...
Page 110: ...110 Troubleshooting ...
Page 120: ...120 Technical data ...
Page 122: ...122 Dimension drawing 3AUA0000094904 ...
Page 123: ...Dimension drawing 123 Required clearances for cooling ...
Page 124: ...124 Dimension drawing ...
Page 126: ...126 Navigation map The navigation map ...
Page 127: ...Navigation map 127 ...
Page 128: ...128 Navigation map ...
Page 130: ...3AUA0000096321 Rev B EN EFFECTIVE 2013 03 14 Contact us www abb com solar ...