![ABB PVS300 Product Manual Download Page 65](http://html.mh-extra.com/html/abb/pvs300/pvs300_product-manual_4153065.webp)
Electrical installation 65
AC cabling connection procedure
Description
1
Isolate the inverter from all possible power sources. See
Isolating the inverter from
external power sources
on page
14
.
2
Insert AC cable through AC
connector body and multilayer
rubber grommet. Discard
unused parts of the rubber
grommet.
3
Strip cable and it’s
conductors. If cable
screen/shield is used as PE
conductor, mark the screen
with yellow/green insulation
tape.
4
Implement the steps below:
1. Connect PE (ye/gr), N
(blue) and L (brown)
conductors firmly to the
terminal, push connector’s
terminal inside the housing.
2. Secure terminal to the
housing with 2 screws at
both sides.
3. Slide rubber grommet
inside housing, secure
cable gland firmly to the
housing.
5
Attach the AC connector to inverter and secure with 2 screws and 3mm hexagonal driver.
6
If necessary, attach an additional PE connector with cable lug to the second PE
connection point.
7
Proceed to
Connecting the control cables
if required.
8
Push in the bottom cover if no other cabling needs to be installed.
Summary of Contents for PVS300
Page 1: ...ABB solar inverters Product manual PVS300 string inverters ...
Page 4: ......
Page 9: ...Table of contents 9 Further information ...
Page 10: ...10 Table of contents ...
Page 34: ...34 Operation basics and hardware description ...
Page 48: ...48 Planning the installation ...
Page 76: ...76 Installation checklist ...
Page 110: ...110 Troubleshooting ...
Page 120: ...120 Technical data ...
Page 122: ...122 Dimension drawing 3AUA0000094904 ...
Page 123: ...Dimension drawing 123 Required clearances for cooling ...
Page 124: ...124 Dimension drawing ...
Page 126: ...126 Navigation map The navigation map ...
Page 127: ...Navigation map 127 ...
Page 128: ...128 Navigation map ...
Page 130: ...3AUA0000096321 Rev B EN EFFECTIVE 2013 03 14 Contact us www abb com solar ...