Planning the installation
What this chapter contains
This chapter instructs in planning the mechanical and electrical installation.
Selecting the location for the inverter
WARNING!
Do not install the inverter in a location where:
• corrosive, explosive or flammable materials are used or stored
• there is a risk of mechanical impacts
• there is a lot of dust, or any conductive dust
• there is a risk of flooding or snow or sand piling
• inverter will be near to a heat source. Exposure to external heat will reduce the
power output capacity and shorten the component lifetime.
• The product is designed for indoor and outdoor installations which meet the
safety, ambient conditions and free space requirements. The installation site must
meet the specification in section
Environmental data and requirements
on page
115
.
The supporting structure
and fastenings must be
strong enough to support
the weight of the inverter
unit(s) and must be made
of non-flammable material.
See section
Mechanical
data
on page
116
.
The installation room or
cabinet must have
adequate ventilation,
airflow and cooling for all
equipment inside. See
Mechanical data
on page
116
. See
Required
clearances for cooling
on
page
123
.
Summary of Contents for PVS300
Page 1: ...ABB solar inverters Product manual PVS300 string inverters ...
Page 4: ......
Page 9: ...Table of contents 9 Further information ...
Page 10: ...10 Table of contents ...
Page 34: ...34 Operation basics and hardware description ...
Page 48: ...48 Planning the installation ...
Page 76: ...76 Installation checklist ...
Page 110: ...110 Troubleshooting ...
Page 120: ...120 Technical data ...
Page 122: ...122 Dimension drawing 3AUA0000094904 ...
Page 123: ...Dimension drawing 123 Required clearances for cooling ...
Page 124: ...124 Dimension drawing ...
Page 126: ...126 Navigation map The navigation map ...
Page 127: ...Navigation map 127 ...
Page 128: ...128 Navigation map ...
Page 130: ...3AUA0000096321 Rev B EN EFFECTIVE 2013 03 14 Contact us www abb com solar ...