Note/Illustration
Action
For the main computer:
•
A2.X3 - X24
•
K2.X8 - A2.X6
•
K2.X2 - K4.X8, A2.X1
•
K2.X12 - A2.K3.X6, A2.K3.X7
•
K6.X2 - A2.X9
•
A2.X5 - K7.X2
•
A2.X4 - K4.X6/K5.1.X5
Note
If the Ethernet extension switch is
installed, connect and disconnect
the connector A2.X4 to/from
K4.X6.
If the Ethernet extension switch is
not installed, connect and discon-
nect the connector A2.X4 to/from
K5.1.X5.
i
For Connected Services Gateway wired, there is no power cable.
Concluding procedure
Note/Illustration
Action
.
Close the door.
1
Perform the function tests to verify that
the safety features work properly, see
2
Product manual - OmniCore C90XT
133
3HAC073706-001 Revision: D
© Copyright 2020-2021 ABB. All rights reserved.
3 Installation and commissioning
3.7.6 Installing the fieldbus master
Continued
Summary of Contents for OmniCore C90XT
Page 1: ...ROBOTICS Product manual OmniCore C90XT ...
Page 50: ...This page is intentionally left blank ...
Page 350: ...This page is intentionally left blank ...
Page 354: ...This page is intentionally left blank ...
Page 412: ...This page is intentionally left blank ...
Page 444: ...This page is intentionally left blank ...
Page 448: ......
Page 449: ......