![ABB IRB 7600 Series Product Manual Download Page 261](http://html.mh-extra.com/html/abb/irb-7600-series/irb-7600-series_product-manual_5083261.webp)
4 Repair
4.3.1. Replacement of cable harness, axes 1-4
259
3HAC022033-001 Revision: K
©
Co
py
rig
h
t 200
4-
201
1 AB
B. All
ri
gh
ts reser
v
ed.
16. Reconnect the
connector R2.M5/6
gently at the
cable division point.
Be careful not to bend the attachment plate when
fastening the screws!
M6, 2 pcs.
17. Secure the cable harness to the upper arm house
by refitting the
velcro strap
to the cable bracket at
the upper arm house.
18. Fit a cable protection to the lower arm, if not
already mounted, with two securing screws (A),
M6x16.
Secure the cable harness with two velcro straps
(B), with a distance of approximately 180 mm. Fix
the strap by wrapping it two turns around the
largest cable before wrapping around the
complete harness.
xx0500002320
19. Refit the cable harness to the
guide plate axis 2
.
20. Refit the
velcro strap
at the guide plate axis 2.
21. If the connection between the SMB battery and
the SMB unit has been broken, the revolution
counters must now be updated!
Detailed in the Calibration chapter -
section
.
22.
DANGER!
Make sure all safety requirements are met when
performing the first test run. These are further
detailed in the section
may cause injury or damage! on page 47
.
Action
Note
Continued
工控帮助教小舒QQ2823408167
长沙工控帮教育科技有限公司