3 Maintenance
3.3.8. Inspection, cable harness
3HAC022033-001 Revision: K
176
©
Co
py
rig
h
t 200
4-
201
1 AB
B. All
ri
gh
ts reser
v
ed.
Inspection, cable harness, axes 5-6
The procedure below details how to inspect the cable harness of axes 5-6.
B
Cable attachment, rear of upper arm
C
Connectors at cable harness division point, R2.M5/6
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
Turn off all electric power and hydraulic but
not the air pressure to the gearboxes, motors
and SMB.
2. Make an overall visual inspection of the cable
harness, in order to detect wear and damage.
3. Check the
attachments at the rear of the
upper arm and in the upper arm tube.
Check the
connectors at the cable harness
division.
Make sure the attachment plate is
not bent or in any other way damaged.
.
4.
NOTE!
If the robot is used in a Foundry Prime appli-
cation, check the
cables
for cracks in
insulation.
5. Replace the cable harness if wear, cracks or
damage is detected.
Detailed in section
cable harness, axes 5-6 on page 260
Continued
工控帮助教小舒QQ2823408167
长沙工控帮教育科技有限公司