4 Repair
4.7.1. Replacement gearbox axis 1
227
3HAC027151-001 Revision: B
©
Co
py
rig
h
t 200
6-
200
8 ABB. All righ
ts reser
v
ed.
5. Remove the cable harness, axes 1-2.
Secure the cable harness to the robot in a
safe way, that it will not be damaged in the
continued removal procedure.
Detailed in section
harness, lower end (axes 1-2) on page
153
6. Run an overhead crane to a position above
the robot.
7.
CAUTION!
The complete arm system weighs 590 kg!
All lifting equipment used must be sized
accordingly!
8. Fit the
lifting tool
and adjust as detailed in
the enclosed instructions.
Also fit a hoisting block to the front, used to
adjust the balance of the armsystem in
order to lift it completely level.
NOTE!
There is an
alternate method
of lifting the
complete armsystem, described below.
Art. no. is specified in
Make sure the lift is done completely level!
How to adjust the lift is described in the
enclosed instruction to the lifting tool.
Read the instructions before lifting!
xx0600003101
•
A : Lifting tool
•
B : Roundsling
•
C : Lifting chain
•
D : Hoisting block
Action
Note
Continued
Continues on next page