The plant voltage must be above the level set for the High Voltage alarm at the VOLTAGE ALARMS
menu screen: MENU
→
CONFIGURE
→
FLOAT SETTINGS
→
VOLTAGE ALARMS
2.
The rectifier must be delivering a current of at least 10% of its capacity.
3.
The rectifier
’
s current output must be unbalanced by more than 10% from the average output
currents of the other rectifiers.
Because item 3 is difficult to achieve in a simulation test of properly functioning serial rectifiers, (even
with load share disabled), rectifiers are tested one at a time, rather than as a group. Slightly different
test procedures are used for special applications in batteryless plants. Serial rectifiers have their own
internal restart circuits which will function 3 times before the rectifier locks itself out and initiates a High
Output Rectifier Fail Alarm to the controller. If there is a sufficient interval between restart and a
subsequent shutdown the rectifier resets its restart counter. The controller initiates a restart signal a
few seconds after the first RFA (HO) alarm is received. After the second RFA (HO) is received, the
controller waits 5 minutes before sending one additional restart signal.
1.
Verify the Auto Restart is enabled from the front panel menus:
2.
Turn off all rectifiers except the rectifier under test by operating their
power switches to STBY.
3.
Adjust the dummy load to provide 10 to 30% of the rectifier
’
s output capacity.
4.
Using the Voltage Alarms Menu Screens, note High Voltage Alarm
threshold value.
5.
Using the Float Settings Menu Screens, select Set Point and note the
value.
NOTE:
The next step WILL RAISE the system voltage.
6.
Use the Arrows, and UP/DOWN keys to change the system float voltage setpoint to 0.1V above the High
Voltage Alarm Threshold.. Press ENTER
to save.
7.
Controller Observations:
•
The plant voltage increases
•
Power Major alarm (PMJ) is generated
Summary of Contents for GPS4827
Page 12: ...Page 12 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 20: ...Page 20 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 24: ...Page 24 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 30: ...Page 30 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 34: ...Page 34 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 62: ...Page 62 Copyright 2021 ABB All rights reserved Control and Operations Menu Map ...
Page 63: ...Page 63 Copyright 2021 ABB All rights reserved Status Menu Map ...
Page 64: ...Page 64 Copyright 2021 ABB All rights reserved History Menu Map Statistics Menu Map ...
Page 80: ...Page 80 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 82: ...Page 82 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 90: ...Page 90 Copyright 2021 ABB All rights reserved This page intentionally left blank ...