![ABB GPS4827 User Manual Download Page 75](http://html.mh-extra.com/html/abb/gps4827/gps4827_user-manual_2838205075.webp)
Page 75
© Copyright 2021 ABB. All rights reserved.
4.
Observe:
•
The plant voltage increases to the set voltage
•
Power Minor alarm (PMN) is generated
•
RECT and MIN LEDs are illuminated
5.
Using the Float Settings Menu Screens, select Set Point.
6.
Use the Arrows, and UP/DOWN keys to change the system float
voltage setpoint to it
’
s original value. Press ENTER to save.
7.
Observe:
•
The plant voltage decreases to the original set voltage
•
Power Minor alarm (PMN) retires
•
RECT and MIN LEDs are extinguished
High Float Voltage Alarm – Systems with Actual Loads
Step
Action for Testing the High Float Voltage Alarm
NOTE
Clear all controller alarms for this test.
NOTE
The System Voltage WILL NOT change.
NOTE
The high float voltage alarm test is completed by changing the
threshold for this condition below the system voltage to make it active.
1.
Using the Float Settings Menu Screens, select Set Point and note the
value..
2.
Using the Voltage Alarms Menu Screens, note the High Float Alarm
threshold value..
3.
Use the Arrows, and UP/DOWN keys to change the High Float Alarm
Threshold to 0.1V below the System Voltage. Press ENTER to save.
4.
Observe:
•
Power Minor alarm (PMN) is generated
•
RECT and MIN LEDs are illuminated
5.
Using the Voltage Alarms Menu Screens, change the High Float Alarm
threshold value to it
’
s original value. Press ENTER to save.
6.
Observe:
•
Power Minor alarm (PMN) retires
•
RECT and MIN LEDs are extinguished
STEP
Action for Testing High Voltage Shutdown Alarm
NOTE:
The High Voltage Shutdown Test is recommended only for new installations where a dummy load is
available prior to the application of office load, and batteries are connected.
NOTE:
There are three requirements for a serial rectifier to shut down upon a controller initiated High Voltage
Alarm.
High Voltage Shutdown – New Installations Only
Summary of Contents for GPS4827
Page 12: ...Page 12 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 20: ...Page 20 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 24: ...Page 24 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 30: ...Page 30 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 34: ...Page 34 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 62: ...Page 62 Copyright 2021 ABB All rights reserved Control and Operations Menu Map ...
Page 63: ...Page 63 Copyright 2021 ABB All rights reserved Status Menu Map ...
Page 64: ...Page 64 Copyright 2021 ABB All rights reserved History Menu Map Statistics Menu Map ...
Page 80: ...Page 80 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 82: ...Page 82 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 90: ...Page 90 Copyright 2021 ABB All rights reserved This page intentionally left blank ...