![ABB GPS4827 User Manual Download Page 37](http://html.mh-extra.com/html/abb/gps4827/gps4827_user-manual_2838205037.webp)
Page 37
© Copyright 2021 ABB. All rights reserved.
Controller Connections
Interface Reference
Description
P1
Connectorized interface for large parallel format 8x40 LCD assembly
P2
10/100 Base
-
T LAN/Ethernet interface
P3
Connectorized interface for 10K/30K thermistor probe options or 210E
P6
Connectorized input for input power, monitoring of two shunts, plant sense voltage, and Major
Fuse alarm (Same connection as on the Millennium)
P7
RJ45 receptacle for ground referenced Auxiliary RS485 circuit and One
-
Wire temperature
monitoring devices
P8
BSL1
-
4 circuit pack Interface connector for Input/Output to controller
P9
RJ45 receptacle for isolated RS485 system component monitoring and control of rectifiers,
converters, low voltage disconnect contactors, and bay level alarm inputs (Serial Rectifier
bus)
P13
Factory test connector (not used in the field)
P14
Connectorized interface for future smaller serial format LCD
P15
Connectorized interface for future smaller serial format LCD
P201
Connectorized interface for optional Modem
P202
Ground referenced DB
-
9 for local RS232 serial port
P205
Option board connector
TB1
Terminal block interface for RS232/RS485 Auxiliary port and Remote Peripheral Module (RPM)
connections
TB2
Terminal block interface for three additional 10K thermistor probe or 210E connection options
J10
USB interface (reserved for future use)
Table 9
-
A: Millennium II Interface Reference
Figure 9
-
2: Millennium II Controller Connections
Summary of Contents for GPS4827
Page 12: ...Page 12 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 20: ...Page 20 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 24: ...Page 24 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 30: ...Page 30 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 34: ...Page 34 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 62: ...Page 62 Copyright 2021 ABB All rights reserved Control and Operations Menu Map ...
Page 63: ...Page 63 Copyright 2021 ABB All rights reserved Status Menu Map ...
Page 64: ...Page 64 Copyright 2021 ABB All rights reserved History Menu Map Statistics Menu Map ...
Page 80: ...Page 80 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 82: ...Page 82 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Page 90: ...Page 90 Copyright 2021 ABB All rights reserved This page intentionally left blank ...