
5 Maintenance
5.3. Maintenance planning
67
3HAW050027150 Revision: C
©
Co
py
rig
h
t 201
3-
101
6 ABB. All righ
ts reser
v
ed.
5.3. Maintenance planning
General
The feather duster must be maintained regularly to ensure proper function. The maintenance
activities and intervals are specified in the table below.
Non-predictable situations may also give rise to inspections of the feather duster. Any damage
must be attended immediately!
Time interval Maintenance
More info.
Daily
Check for faults
Check for loose or damaged feathers
Check for machine damage
Weekly
Clean the unit
Weekly cleaning and
inspection on page 68
Clean and adjust ion bars
Check ionizing bars correct operation
Check cables and flexible hoses for wear
Check that all pneumatic connections are
secure
Ever 2500h
Check the belt tension
Check the bearing guides and bearings
Every 6 months Replace the feather roller
Feather roller care and
replacement on page 69
Annually
Verify that all fasteners, bolts and nuts are tight
Every 16000h
Replace the timing belt
Summary of Contents for Feather Duster
Page 1: ...Product manual Feather Duster ...
Page 2: ......
Page 12: ...3HAW050027150 Revision C 10 Copyright 2013 1016 ABB All rights reserved ...
Page 92: ... Copyright 2013 1016 ABB All rights reserved ...
Page 100: ... Copyright 2013 1016 ABB All rights reserved ...
Page 110: ......
Page 148: ... Copyright 2013 1016 ABB All rights reserved ...
Page 149: ......