Modifications reserved
Page 21/26
16
Wiring and block diagrams for all frames and modules
The customer has to supply the wiring to connect the UPS to the local power source. The installation
inspection and initial start-up of the UPS and extra battery cabinet must be carried out by a qualified
service personnel such as a licensed service engineer from the manufacturer or from an agent
certified by the manufacturer. More details and procedure are mentioned in the user manual.
16.1
Terminal connections overview
Frame type
(T) Compression type
Terminals
(B) Bolted Terminals
Battery
earth
PE
Separate
battery
(+ / N / - )
Common
battery
(+ / N / - )
Input
bypass
3+N
Input
rectifier
3+N+PE
Output
load
3+N+PE
UPScale ST 40
NOT ALLOWED
4 x 16/25 mm
2
(T)
5 x 16/25 mm
2
(T)
UPScale ST 60
4 x 35 mm
2
(T)
4 x 35 mm
2
(T)
+ PE 50 mm
2
(T)
UPScale ST 80
50mm
2
(T)
4x
(3 x 10/16mm
2
) (T)
3 x M6 (B)
3 x 50mm
2
(T)
+ N 50mm
2
(T)
3 x 50mm
2
(T)
+ N 50mm
2
(T)
+ PE 50 mm
2
(T)
UPScale ST 120
1xM10 (B)
6x
(3 x 10/16mm
2
) (T)
3 x 2xM5 (B) or
3 x M10 (B)
4 x 95mm
2
(T)
4 x 95mm
2
(T)
+ PE M10 (T)
UPScale ST 200
1x M10
(B)
5x
(3 x 35mm
2
) (T)
2 modules have
common battery
2x (3x M10) (B)
3x M12 (B)
+ PE 1x M12
4x M12 (B)
+ PE 1x M12
16.2
Terminal connections
UPScale ST 40 & ST 60
Input
Output
UPScale ST 80
Battery
Input
Output
Summary of Contents for DPA UPScale ST40
Page 1: ... Copyright 2017 ABB All rights reserved User Manual DPA UPScaleTM ST S2 10 200 kW ...
Page 76: ...Modifications reserved Page 76 79 10 Attachments 10 1 Technical data sheet ...
Page 78: ......
Page 79: ... Copyright 2017 ABB All rights reserved Technical data sheet DPA UPScaleTM ST S2 10 200 kW ...
Page 104: ......
Page 105: ... Copyright 2017 ABB All rights reserved Technical data sheet DPA UPScaleTM ST S2 10 200 kW ...