Page 3
© Copyright 2021 ABB. All rights reserved.
PRODUCT MANUAL
CPS2400U Upstream System –
19”
Remote Power System
48 V
dc
Input, ±190 V
dc
Output Converter/Limiter System
TABLE OF CONTENTS
Table of Contents
......................................................................................................................................
3
Table of Figures
········································································································································
5
Table of Tables
·········································································································································
6
Introduction
···············································································································································
7
Reference Documents
·····································································································································
7
Customer Service Contacts
····························································································································
7
On
-
Line Power Systems Product Manuals and Software
··········································································
7
Product Description
··································································································································
9
Operation
·······················································································································································
10
Configurations
···············································································································································
11
Installation
···············································································································································
13
Prepare for Installation
·································································································································
13
Mount Shelves
···············································································································································
14
Ground Converter Shelves
····························································································································
16
Connect Input Power
·····································································································································
16
Connect Load Wiring
····································································································································
20
Inspect the Network
·····································································································································
.21
Install Controller
············································································································································
22
Set Shelf ID
·····················································································································································
23
Install Inter
-
Shelf Signal Cables
··················································································································
25
Connect Office Alarms
·································································································································
25
Connect Local Network
································································································································
26
Install Converters
···········································································································································
27
Apply DC Power
··············································································································································
27
Verify Normal States
·····································································································································
28
Verify UL Installation Compliance
··············································································································
28
Configure Controller
·····································································································································
28
Confirm Operation of Alarm Wiring
···········································································································
29
Troubleshooting
······································································································································
31
System
·····························································································································································
31
Alarm Card
······················································································································································
33
Summary of Contents for CPS2400U
Page 2: ...Page 2 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 8: ...Page 8 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 12: ...Page 12 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 30: ...Page 30 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 49: ...Page 49 Copyright 2021 ABB All rights reserved Figure 33 Converter Slot Fillers ...