Step
Action
3.
Remove power from all DC connections to be installed.
Turn off circuit breakers and remove fuses.
Verify with a Volt meter.
4.
Turn OFF circuit breakers assigned to this frame and verify with an volt meter
5.
Open the distribution panel door on the right end of the shelf.