Step
Action
8
Test each circuit by powering an open circuit at the remote end of the wire with a QS982 output. If red lights do
not flash, there is no leakage path to ground at operating voltage. If the FLT light does not blink yellow, there is no
hard short between tip and ring.
Note:
1.
This step is shown here only for completeness. It is to be performed after the
Apply DC Power
section is
completed.
2.
Circuit powering is usually accomplished by closing the circuit using a 5
-
pin protector after DC power
applied to the system.
Install Controller
Step
Action
1.
2.
Screw
Summary of Contents for CPS2400U
Page 2: ...Page 2 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 8: ...Page 8 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 12: ...Page 12 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 30: ...Page 30 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Page 49: ...Page 49 Copyright 2021 ABB All rights reserved Figure 33 Converter Slot Fillers ...