GAA610-M
ADVANCED EMISSION GAS MONITORING SYSTEM | OI/GAA610-M-EN REV. B
93
Prepare the new AO2020
The new AO2020 is calibrated and ready for use. Only the gas
connections need to be screwed into the connection plate. Make
sure that the connections are gas tight.
Install the new AO2020
1. Insert the prepared AO2020 into the housing of the GAA610-
M and fix it.
2. Mount the holder for the cable tube.
3. Connect all plugs and hoses as previously marked.
4. Mount the rack with the four screws on the front side.
5. Turn on the main switch and wait for the system to power
up. Note that the system must heat up before it is ready for
operation.
6. The serial number of the SCC-F must now be entered in the
menu. Proceed as follows:
‘MENU /Configure / System / Setup system modules’
7. Select the Cooler, SCC-F Application.
8. Press ‘
CHANGE
’ (PW: 081500).
9. Now enter the individual electronics number you have noted.
Confirm your settings.
10. Save the changed configuration.
‘MENU /Configure / System / Save configuration’
⇒
‘
ENTER
’.
11. The system should now work as usual. (It is possible that you
will have to acknowledge the error messages that have
appeared after the system has been changed. This is
possible in the ‘
STATUS MESSAGE
’).
12. Check the seal integrity according to the description in
13. If there are no errors and the system is heated up, perform
an automatic calibration. The system is now ready for
operation.