![ABB CEMcaptain GAA610-M Operating Instruction Download Page 31](http://html1.mh-extra.com/html/abb/cemcaptain-gaa610-m/cemcaptain-gaa610-m_operating-instruction_3626267031.webp)
GAA610-M
ADVANCED EMISSION GAS MONITORING SYSTEM | OI/GAA610-M-EN REV. B
31
7
Gas connections
Position and design of the gas connections
Figure 23: Gas connections GAA610-M
Pos.
Connection
Additional Information
Design
TSG2
Sample gas inlet
For heated sample gas line TBL01 with outer diameter of
48 mm
Tube fitting 4/6 × 1 mm
TP7
Calibration gas inlet
—
Tube fitting for PTFE pipe 4/6 × 1 mm
TP8
Sample gas outlet / Analyzer cabinet
ATM vent
Vent out room safety area
Tube fitting for PTFE pipe 10/12 × 1 mm
TP9
Condensate water drain port
—
Tube fitting DN 6 / 4 mm, PVDF
TP10
Condensate water drain port
From air condition
10 mm tube
—
Instrument air inlet
Located at the backpurging panel, see
on page 23
10 mm O.D. Tube fitting for stainless steel pipe
or
compressed-air hose
(plus pressure gauge and shut-off valve)