Warm-up phase
The warm-up time for the system is approx. 2 to 4 hours.
The warm-up phase can take longer if the analyzer system was
not brought to room temperature before the power supply was
activated.
Note
During the warm-up phase measurement values can be outside
the ranges specified in the data sheet.
End of the warm-up phase
The warm-up phase is over when the temperature and flow
status messages are gone and the measured value drift is
acceptable. The latter depends on the size of the measurement
range.
Readiness, sample gas supply
At the end of the warm-up phase the analyzer system is ready for
operation and automatically activates the sample gas supply.
Calibration
Calibration should only be started after the warm-up phase.