ADVANCED EMISSION GAS MONITORING SYSTEM | OI/GAA610-M-EN REV. B
43
10
Commissioning and operation
Safety instructions
NOTICE
Damage to the analyzer system!
Damage to the analyzer system and its components due to
improper commissioning.
• The analyzer system must stand in its operating position
for about 24 hours prior to start-up.
• Before activating the power supply check once again that
the analyzer system operating voltage is set to match the
line voltage.
Note
Initial startup of the analyzer system should be performed by
trained personnel of the manufacturer or the supplier. ABB
recommends having the startup done by ABB personnel.
When safe operation can no longer be assured
If it is apparent that safe operation is no longer possible, the
device should be taken out of operation and secured against
unauthorized use.
The possibility of safe operation is excluded:
• If the device is visibly damaged,
• If the device no longer operates,
• After prolonged storage under adverse conditions,
• After severe transport stresses.
Transportation restraints removal
1
Sample Gas Feed Unit SCC-F transportation restraints
2
Sample Gas Cooler SCC-C transportation restraints
Figure 29: Position of transportation restraints (Bottom view of analyzer cabinet)
Sample Gas Feed Unit SCC-F
Diaphragm Pumps transportation restraints:
Using a Ph2 crosshead screwdriver, remove the two M6×25
screws
1
through the holes in the base plate from the
diaphragm pumps base plate.
Note
Retain the screws in case the unit needs to be transported again
in the future.
Sample Gas Cooler SCC-C
Compressor transportation restraints:
Using an offset Ph2 crosshead screwdriver, loose the two
screws
2
counter-clockwise through the holes in the base
plate to the point at which the compressor housing is in
contact with the base plate (noticeable resistance).