Installation checklist 77
7
Installation checklist
Contents of this chapter
This chapter contains instructions for checking the installation of the wind turbine
converter.
Before you start
Check the mechanical and electrical installation of the converter before start-up. Go
through the checklist together with another person.
WARNING!
Only qualified electricians are allowed to carry out the work described
below. Do the tasks described in the safety instructions of the converter. If you
ignore them, injury or death, or damage to the equipment can occur.
1. Open the main disconnector of the converter and lock it to open position.
2. Ensure by measuring that the converter is not powered.
Summary of Contents for ACS880-87LC-4000A/4021A-7
Page 4: ......
Page 10: ...10 ...
Page 17: ...Safety instructions 17 1 3 2 4 5 6 7 ...
Page 18: ...18 Safety instructions 8 9 ...
Page 28: ...28 Introduction to the manual ...
Page 52: ...52 Mechanical installation ...
Page 66: ...66 Planning the electrical installation ...
Page 74: ...74 Electrical installation Diagrams for the customer connections are presented below ...
Page 75: ...Electrical installation 75 optional Fast shutdown ...
Page 85: ...Maintenance 85 b c a Air flow direction 2 3 4 6 ...
Page 87: ...Maintenance 87 2 5 4 ...
Page 88: ...88 Maintenance 7 Arrow indicating the air flow direction 5 6 6 ...
Page 90: ...90 Maintenance Air flow circulation b a ...
Page 106: ...106 Maintenance ...
Page 124: ...124 Control units of the converter ...
Page 126: ...126 Dimension drawings ...
Page 127: ...Dimension drawings 127 ...
Page 128: ...128 Dimension drawings ...
Page 142: ...142 Cooling and heating ...