Electrical installation 71
When single-core cables without metal shield are used:
•
Lead the cables into the inside of the cubicle through the IP sealing glands.
•
Connect the phase conductors to terminals U2, V2 and W2, and the PE
conductors to the PE terminal. Tighten the phase and PE conductors (see
page
5. Provide support for the cables whenever necessary.
6. Remove the cover on top of the converter module.
WARNING!
The cover on top of the converter module can cause
overheating. Injury or death, or damage to the equipment can occur.
7. Refit the shroud removed earlier and close the door.
8. Connect the generator end of the cable. For minimum radio frequency interference
and generator bearing current, ground the cable shield 360° at the lead-through of the
generator terminal box. For the generator specific instructions, see the manufacturer’s
user manual.
360° grounding of the shield
Cable shield grounding means at the generator end
8
Summary of Contents for ACS880-87LC-4000A/4021A-7
Page 4: ......
Page 10: ...10 ...
Page 17: ...Safety instructions 17 1 3 2 4 5 6 7 ...
Page 18: ...18 Safety instructions 8 9 ...
Page 28: ...28 Introduction to the manual ...
Page 52: ...52 Mechanical installation ...
Page 66: ...66 Planning the electrical installation ...
Page 74: ...74 Electrical installation Diagrams for the customer connections are presented below ...
Page 75: ...Electrical installation 75 optional Fast shutdown ...
Page 85: ...Maintenance 85 b c a Air flow direction 2 3 4 6 ...
Page 87: ...Maintenance 87 2 5 4 ...
Page 88: ...88 Maintenance 7 Arrow indicating the air flow direction 5 6 6 ...
Page 90: ...90 Maintenance Air flow circulation b a ...
Page 106: ...106 Maintenance ...
Page 124: ...124 Control units of the converter ...
Page 126: ...126 Dimension drawings ...
Page 127: ...Dimension drawings 127 ...
Page 128: ...128 Dimension drawings ...
Page 142: ...142 Cooling and heating ...