104 Electrical installation
DI6 (XDI:6) as PTC sensor input
PTC sensors can be connected to this input for motor temperature measurement as
follows. The sum of the sensor resistances must not exceed the threshold resistance
of the digital input at the motor normal operating temperature. Do not connect both
ends of the cable shield directly to ground. If a capacitor cannot be used at one end,
leave that end of the shield unconnected. See the firmware manual for parameter
settings.
Note
: PTC sensors can alternatively be connected to FEN-xx encoder interface
module.
Safe torque off (XSTO)
For the drive to start, both connections (OUT1 to IN1 and IN2) must be closed. By
default, the terminal block has jumpers to close the circuit. Remove the jumpers
before connecting an external Safe torque off circuitry to the drive. See page
Safety functions (X12)
See section
Implementing the Safety functions options
, and
FSO-11
user’s manual
(3AUA0000097054 [English]).
WARNING!
As the inputs pictured above are not insulated according to
IEC 60664, the connection of the motor temperature sensor requires double
or reinforced insulation between motor live parts and the sensor. If the assembly
does not fulfill the requirement, the I/O board terminals must be protected against
contact and must not be connected to other equipment or the temperature sensor
must be isolated from the I/O terminals.
T
3.3 nF
> 630 V AC
PTC
DI6
+24VD
T
T
“0” > 4 kohm
“1” < 1.5 kohm
I
max
= 5 mA
ACS880-01 HW.book Page 104 Monday, July 1, 2013 4:51 PM
Summary of Contents for ACS880-01 Series
Page 4: ...ACS880 01 HW book Page 4 Monday July 1 2013 4 51 PM...
Page 12: ...12 ACS880 01 HW book Page 12 Monday July 1 2013 4 51 PM...
Page 20: ...20 Safety instructions ACS880 01 HW book Page 20 Monday July 1 2013 4 51 PM...
Page 26: ...26 Introduction to the manual ACS880 01 HW book Page 26 Monday July 1 2013 4 51 PM...
Page 80: ...80 Planning the electrical installation ACS880 01 HW book Page 80 Monday July 1 2013 4 51 PM...
Page 96: ...96 Electrical installation 8b R8 R9 ACS880 01 HW book Page 96 Monday July 1 2013 4 51 PM...
Page 98: ...98 Electrical installation 16 13 R8 R9 ACS880 01 HW book Page 98 Monday July 1 2013 4 51 PM...
Page 118: ...118 Start up ACS880 01 HW book Page 118 Monday July 1 2013 4 51 PM...
Page 120: ...120 Fault tracing ACS880 01 HW book Page 120 Monday July 1 2013 4 51 PM...
Page 131: ...Maintenance 131 3 4 5 3 ACS880 01 HW book Page 131 Monday July 1 2013 4 51 PM...
Page 172: ...172 Technical data ACS880 01 HW book Page 172 Monday July 1 2013 4 51 PM...
Page 196: ...196 Dimension drawings ACS880 01 HW book Page 196 Monday July 1 2013 4 51 PM...
Page 209: ...Safe Torque off function 209 Certificate ACS880 01 HW book Page 209 Monday July 1 2013 4 51 PM...
Page 210: ...210 Safe Torque off function ACS880 01 HW book Page 210 Monday July 1 2013 4 51 PM...
Page 220: ...220 Resistor braking ACS880 01 HW book Page 220 Monday July 1 2013 4 51 PM...