Connection procedure
1.
Strip the input power cable. Ground the bare shield of the cable (if any) 360 degrees
under the grounding clamp. Fasten the grounding conductor (PE) of the input power
cable under the screw of the grounding clamp. Connect the phase conductors to the
U1, V1 and W1 terminals.
2.
Strip the motor cable. Ground the bare shield of the cable 360 degrees under the
grounding clamp. Twist the shield to form as short a pigtail as possible and fasten it
under the screw of the grounding clamp. Connect the phase conductors to the U2, V2
and W2 terminals.
3.
Connect DC input to the BRK+ and BRK- terminals with a shielded cable using the
same procedure as for the motor cable.
4.
Secure the cables outside the drive mechanically.
To identify the frame size of your inverter, see
, page
.
Frame size
Tightening torque
Max. wire size
N·m (lbf·in)
R0…R2
0.8 (7)
4.0/6.0 mm
2
(10 AWG)
R3
1.7 (15)
10.0/16.0 mm
2
(6 AWG)
R4
2.5 (22)
25.0/35.0 mm
2
(2 AWG)
Summary of Contents for ACS355 series
Page 1: ...ABB machinery drives Supplement ACS355 Solar pump inverter N827...
Page 4: ......
Page 10: ...10 Safety...
Page 14: ...14 Introduction...
Page 18: ...18 Operating principle and hardware description...
Page 30: ...30 Start up and controls...
Page 36: ...36 Program features...
Page 66: ...66 Actual signals and parameters...
Page 70: ...70 Fault tracing...
Page 76: ...76 Technical data...