
96
January 2016
Updated
Phase and Brownout Protection Module section
and added
Freeze Stat Startup
section.
April 2016
Added
Adjustable Fan Cycling Switch Procedure
section.
May 2016
Added AAON Touchscreen Controller.
July 2016
Updated Neoprene statements and
E-Coated Cleaning
section.
January 2017
Added Variable Speed Compressor option.
May 2017
The maximum allowable voltage imbalance updated. Updated Factory Technical Support Phone
number.
July 2017
Updated the
Allowed Chemical Cleaners and Procedures.
Added
Outdoor Airflow Monitoring
options; Feature 14A. Added
Shaft Grounding
options; Feature 1B and Feature 5A. Added
High
Condensate Level Switch
; Feature 11. Added
Shrink Wrap
Options; Feature 20. Added
High
Turndown Modulating Gas
option; Feature B3. Updated modulating gas turndown ratios.
August 2017
Added
Compressor Sound Blanket
and
UV Light
options; Feature 16. Removed
VCM-X
options
from Feature 22.
Summary of Contents for RQ SERIES
Page 2: ......
Page 29: ...29 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations ...
Page 43: ...43 Figure 21 Example 2 6 ton through the Base Gas Piping ...
Page 49: ...49 Figure 22 Post Corner Hole Location Figure 23 Post Back Hole Location ...
Page 50: ...50 Figure 24 Post Corner Hole Piping Figure 25 Post Back Hole Piping ...
Page 67: ...67 Gas Heater Instructions Figure 27 Gas Heater Instructions ...
Page 97: ......
Page 98: ......
Page 99: ......