Literature Change History
February 2011
Added information regarding the charging of a heat pump and added additional information
regarding freezing water in the heat exchanger.
June 2011
Updated filter information.
April 2012
Added chilled water, hot water, and steam coil connection sizes.
August 2012
Added seismic curb installation instructions.
November 2012
Update of the IOM adding information about compressor cycling.
May 2013
Added options to the feature string, added curb gasket information, added auxiliary electric
heating capacities table, corrected condenser water connections table, added section for variable
capacity compressor controller, and added Appendix B.
October 2013
Added cautions calling for the need to seal water, electrical, and gas entries into the unit.
January 2014
Added electric preheat options and installation information.
February 2014
Added energy recovery wheel installation, maintenance, and startup information.
July 2014
Added electric preheat controller operation information. Added VCB-X and 380V/50Hz features.
August 2014
Added more detailed microchannel coil cleaning instructions.
January 2015
Table
Gas Heat Output Capacities
updated.
July 2015
Removed 2” Throwaway Unit Filter-25% Efficient from Filter Replacement information.
September 2015
Updated RQ Metal Mesh Filter sizes.
Summary of Contents for RQ SERIES
Page 2: ......
Page 29: ...29 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations ...
Page 43: ...43 Figure 21 Example 2 6 ton through the Base Gas Piping ...
Page 49: ...49 Figure 22 Post Corner Hole Location Figure 23 Post Back Hole Location ...
Page 50: ...50 Figure 24 Post Corner Hole Piping Figure 25 Post Back Hole Piping ...
Page 67: ...67 Gas Heater Instructions Figure 27 Gas Heater Instructions ...
Page 97: ......
Page 98: ......
Page 99: ......