
90
RQ Series Startup Form
Job Name:_______________________________________________
Date:______________
Address:______________________________________________________________________
______________________________________________________________________________
Model Number:_________________________________________________________________
Serial Number:_____________________________________________ Tag:_______________
Startup Contractor:______________________________________________________________
Address:______________________________________________________________________
_______________________________________________________
Phone:______________
Pre Startup Checklist
Installing contractor should verify the following items.
1.
Is there any visible shipping damage?
Yes No
2.
Is the unit level?
Yes No
3.
Are the unit clearances adequate for service and operation?
Yes No
4.
Do all access doors open freely and are the handles operational?
Yes No
5.
Have all electrical connections been tested for tightness?
Yes No
6.
Does the electrical service correspond to the unit nameplate?
Yes No
7.
On 208/230V units, has transformer tap been checked?
Yes No
8.
Has overcurrent protection been installed to match the unit nameplate
requirement?
Yes No
9.
Have all set screws on the fans been tightened?
Yes No
10.
Do all fans rotate freely?
Yes No
11.
Does any field water piping to the unit appear to be correct per design
parameters?
Yes No
12.
Is all copper tubing isolated so that it does not rub?
Yes No
13.
Has outside air rain hood been opened?
Yes No
14.
Have the damper assemblies been inspected?
Yes No
15.
Are air filters installed with proper orientation?
Yes No
16.
Have condensate drain and p-trap been connected?
Yes No
Ambient Temperature
Ambient Dry Bulb Temperature ________°F
Ambient Wet Bulb Temperature ________°F
Summary of Contents for RQ SERIES
Page 2: ......
Page 29: ...29 Figure 3 RQ Cabinet Standard and Power Exhaust Gasket Locations ...
Page 43: ...43 Figure 21 Example 2 6 ton through the Base Gas Piping ...
Page 49: ...49 Figure 22 Post Corner Hole Location Figure 23 Post Back Hole Location ...
Page 50: ...50 Figure 24 Post Corner Hole Piping Figure 25 Post Back Hole Piping ...
Page 67: ...67 Gas Heater Instructions Figure 27 Gas Heater Instructions ...
Page 97: ......
Page 98: ......
Page 99: ......