Operating and Assembly Instructions Flexilo FLAT BOTTOM for wood pellets
Assembly
Subject to technical change
Issue 09/2016
Page 18 of 32
©A.B.S. Silo- und Förderanlagen GmbH
Connecting the frame feet to the plug-in elements of the top and base connectors:
Assembly of the plug-in elements
Assemble the steel frame until all top and base connectors as well as the drawing
irons are connected.
Stand with drawing irons pre-assembled