Operating and Assembly Instructions Flexilo FLAT BOTTOM for wood pellets
Scope of delivery
Subject to technical change
Issue 09/2016
Page 14 of 32
©A.B.S. Silo- und Förderanlagen GmbH
11
1 piece per filling pipe
1 fastener 36/36
2 pipe clamps M10/M12
(pre-assembled on the fastener)
12
2x
2x
4x
Screw-set for filling-set
(pre-assembled on the fastener))
2 hex screws M12 x 25
2 spring washers Ø 12,2
4 washers Ø 13
13
1 piece per filling pipe
1 ground strap clamp NW 3/8-4“
14
2x
2x
4x
Screw-set for filling-set
(pre-assembled on the filling-pipe)
2 hex screws M10 x 140
4 washers M10
2 nuts M10
15
1 piece per filling pipe
Tension rings with sealing
compound
16
1 piece per filling pipe
Aluminium coupling with
temporary cover (Storz A)
17
1 piece per filling pipe
Hose clamp for ø 90 to ø 100 mm
18
OPTIONAL:
Support Structure for fixing the silo lid
½“ pipe must be provided by the customer