Operating and Assembly Instructions Flexilo FLAT BOTTOM for wood pellets
Assembly
Subject to technical change
Issue 09/2016
Page 24 of 32
©A.B.S. Silo- und Förderanlagen GmbH
Conduction 1: 50/50 (galvanized suction probe)
LOWER CONNECTION
SUCTION LINE
UPPER CONNECTION
RETURN AIR LINE
Conduction 2: 50/45 (black suction probe)
LOWER CONNECTION
RETURN AIR LINE
UPPER CONNECTION
SUCTION LINE
Do fasten it on the suction station the same way, too!
Routing for suction probe/hoses
Please note that the suction probes also have to be grounded!
In order to ground the suction probes, please bare the flexible earthing lead on the hoses for
approximately 4-5 cm and bend it inwards into the hose.
5.8
Connecting the suction probes
Number the suction probes as shown in the diagram above. Connect the suction probes to
the connection station from left to right in ascending order from 1 to 5 (the figure only shows
the connection station with 4 connections).
Here, do also ensure that you fasten the suction probes and the suction station
correctly depending on the version.
There are two methods of using the connection station:
A
Probe 1 remains connected for so long until pellets are no longer being conveyed, then you
can change in ascending order provided the suction probes are connected according to the
numbering.
B
Swap suction hoses at regular intervals to ensure even extraction from the silo.
Suction station
ATTENTION!!!
Don’t fix the manual switching unit (suction station) on
the ground!!!