background image

Quick Start Guide

3M™ Model 711 Digital Conversion Station

©3M June 2000

25

Conversion Planning

Conversion Suggestions

A conversion coordinator should be designated to direct and monitor the conversion
effort. 

The coordinator should have a method for tracking conversion status, training operators,

and managing the logistics of conversion.

Don’t crowd the conversion area. 

Conversion cannot proceed if multiple D1 tags are sensed

or if the operator position/location is crowded.

Use two-person teams. 

Use of two-person teams reduces errors and improves productivity.

One team member can move items while the other can do the actual conversion. 

Frequent

task switching keeps both team members fresh.

Plan the overall material flow. 

Use carts or other aids to move materials into and away from

the conversion station.

Plan the material flow to minimize library disruption.

 For example, do one section at a time

and move the conversion station as needed.

Convert books that need to be returned to the shelves. 

Convert all books that are returned

to or used inside the library before putting books back onto the shelves.

CAUTION

: Make sure the power cord does 

not 

present a hazard.

Summary of Contents for Charge Analyzer 711

Page 1: ...Brand Digital Identification D1 Tag Only 3M Brand Digital Identification D1 Tags are to be used with the Model 711 Digital Conversion Station The use of other materials could lead to poor performance...

Page 2: ...on Conversion Station Possibility of unsafe handling and disposal of components of the Conversion Station Any batteries circuit boards etc must be handled and disposed of in accordance with local dis...

Page 3: ...d by the FCC under the FCC ID number shown above This device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 this device may not cause harmful interferenc...

Page 4: ...711 Digital Conversion Station Quick Start Guide 4 3M June 2000 EMC Compliance Europe Conformity assessment and marking requirements to be determined Conformity assessment in progress at time of publ...

Page 5: ...harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation CANADA __________ This Class A digital apparatus meets all requi...

Page 6: ...the machine from the shipping crate using a ramp Be very careful when moving the machine down the ramp and onto the floor Before You Start Setting up the Conversion Station DO NOT PLUG THE CONVERSION...

Page 7: ...inside the front doors Figure 1 Unopened Crate 2 Remove the side of the crate The side you remove will be used as a ramp 3 Set the ramp onto the pallet so that the pins on one end of the ramp align w...

Page 8: ...achine 6 The plastic covering on the machine is secured with tape Grasp the tape and plastic covering and slowly pull the machine out of the shipping crate Figure 3 Figure 3 Removing Conversion Statio...

Page 9: ...the left front door pull down on the pins to release the door Figure 5 Figure 5 Releasing upper and lower pin on the left front door 5 Unpack the support mast with scanner and monitor Figure 6 Figure...

Page 10: ...nner cable into the mast hole Figure 7 Figure 7 Inserting black scanner cable into mast hole 7 Insert the gray video cable into the mast hole Figure 8 a Position the gray video cable in the mast hole...

Page 11: ...in mast hole slot a The bottom of the support mast has a notch With the notch facing the front of the unit insert the support mast in the mast hole The notch fits over a pin located inside the cabine...

Page 12: ...IS OFF 9 Connect the gray video cable 50 pin connector to the connector located in the back of the monitor Figure 11 a Push any excess cable down inside the cabinet Figure 11 Gray video cable connect...

Page 13: ...connector on the computer e Connect the AC power cord to the AC power connector located on the outside lower right hand side of the Conversion Station Figure 13 Figure 13 AC power cord connected 11 En...

Page 14: ...on the monitor 5 The computer initializes and displays the main conversion screen 6 If power does not come on check that the circuit breaker located inside the cabinet on the lower right side is in th...

Page 15: ...Up Position 3 Release the stop lever so that it drops down into a horizontal straight out position Figure 17 4 Remove the two plastic core inserts from the supply roll shaft Figure 17 Figure 17 Relea...

Page 16: ...roll Figure 19 Figure 19 Leader Coming Off Left Side Threading Leader Up Under Curved Spring Plate 6 Thread the leader of the D1 roll of tags up through the tag feed area under the curved steel sprin...

Page 17: ...ader pass on the side of the guide plate toward the take up spool Figure 21 Figure 21 Putting a Slight Upward Bend in Leader 9 Push the leader back down into the slot of the tag feeder opening on the...

Page 18: ...a under the curved steel spring plate b back down into the slot of the tag feeder opening on the same side of the wire spring c down toward the take up spool on the side of the guide plate toward the...

Page 19: ...ition the slot rotate the take up spool by pushing down on the tag dispenser switch until the crimp slot is at or near the top Figure 26 Guiding Leader Around Take Up Spool b Rotate the take up spool...

Page 20: ...Figure 28 Figure 28 Rotating the Stop Lever to Down Position 14 Place the tag dispenser switch in the ON up position Figure 29 Figure 29 Setting the Tag Dispenser Switch to ON 15 The dispenser automat...

Page 21: ...on Station 3M June 2000 21 Note If the leader is excessively long the motor may stop automatically Restart the motor by turning the dispenser switch OFF middle position and then ON again Normal operat...

Page 22: ...op down list box select the appropriate button Use the mouse or touch the screen to make a selection Use the keyboard to type in the branch name Branch ID To add a new branch ID or to edit or remove a...

Page 23: ...r slightly above the surface of the read write area on the left side of the work surface The audible beep or tag placement sound indicates that the tag has been successfully programmed The touch scree...

Page 24: ...mentation The Digital Conversion Station has extensive online documentation that contains procedures troubleshooting and reference material The online operator s documentation should be reviewed as th...

Page 25: ...person teams Use of two person teams reduces errors and improves productivity One team member can move items while the other can do the actual conversion Frequent task switching keeps both team membe...

Page 26: ...n Station software allows staff to make limited configuration changes The library administrator and computer support staff can make additional advanced configuration changes Password Information All i...

Reviews: