![3M Charge Analyzer 711 Quick Start Manual Download Page 14](http://html1.mh-extra.com/html/3m/charge-analyzer-711/charge-analyzer-711_quick-start-manual_3158023014.webp)
3M™ Model 711 Digital Conversion Station
Quick Start Guide
14
©3M June 2000
Startup
1. Unlock the four wheels.
2. Move the Conversion Station near a power outlet and plug it in. Be sure the tag dispenser
switch is
OFF
(middle position).
3. Turn
ON
the Conversion Station power switch located on the lower right side of the station.
4. Push the monitor
ON/OFF
switch to turn on the monitor.
5. The computer initializes and displays the main conversion screen.
6. If power does not come on, check that the circuit breaker located inside the cabinet on the
lower right side is in the
ON
(up) position. Make sure each end of the power cord is securely
connected.
Loading the D1 Tag Dispenser
1. Make sure the tag dispenser switch to the right of the supply roll shaft is set to the
OFF
(middle) position before loading the tag dispenser (
Figure 15
).
Figure 15: D1 Tag Dispenser
stop lever
curved steel
spring plate
supply roll shaft
take-up
spool
switch
1.