
Configuring X.25
97
Scenario 3: Fully
Meshed Topology
A fully meshed topology consists of bridge/routers that are connected
directly to every other bridge/router. Between each bridge/router, you
must order a Frame Relay circuit from the service provider.
No configuration is required for this scenario.
Configuring X.25
This section describes two X.25 scenarios:
■
Scenario 1: Multiple Destinations, Nonmeshed
■
Scenario 2: Fully Meshed Topology
See
Using Enterprise OS Software
to modify the default DTE profile, to
create a permanent virtual circuit (PVC), or to configure connection
services.
!6 (port)
NETBuilder/II
®
CSU/DSU
CSU/DSU
CSU/DSU
CSU/DSU
!5 (path)
Frame Relay
Summary of Contents for NETBuilder SI
Page 6: ......
Page 22: ...22 CHAPTER 1 FEATURES AND SPECIFICATIONS...
Page 28: ...28 CHAPTER 2 USING THE BRIDGE ROUTER IN YOUR NETWORK...
Page 40: ...40 CHAPTER 3 INSTALLING THE HARDWARE...
Page 52: ...52 CHAPTER 4 INSTALLING OR REMOVING AN INTERFACE MODULE...
Page 78: ...78 CHAPTER 6 BASIC CONFIGURATION OF PORTS AND PATHS...
Page 100: ...100 CHAPTER 7 ADVANCED CONFIGURATION OF PORTS AND PATHS...
Page 120: ...120 CHAPTER 9 CUSTOMIZING YOUR SOFTWARE...
Page 150: ...150 APPENDIX A TROUBLESHOOTING...
Page 162: ...162 APPENDIX C SYNTAX CONVENTIONS...
Page 196: ...196 APPENDIX E PROVISIONING YOUR ISDN LINE...
Page 202: ......
Page 210: ...210 INDEX...
Page 212: ......