
136
A
PPENDIX
A: T
ROUBLESHOOTING
Before running the CSU/DSU loopback test:
■
Attach a console or Telnet to your bridge/router.
■
Cable your WAN port to the telco network.
■
Make sure the device you are connecting to supports V.54 loopback
and is in loopback mode.
To perform a V.54 loopback test on the built-in CSU/DSU, follow
these steps:
1
Diasble the path by entering:
SETDefault !3 -PATH CONTrol = Disable
2
Start the loopback test by entering:
SET -SYS V54Lback = YES
SET -SYS V54Lback = START
The loopback test runs for approximately one minute. If the loopback test
was successful, the following message is displayed:
V.54 data loopback succeeded
If the destination device does not respond, the following message is
displayed:
V.54 local loopback terminated - remote site not responding
If the data is corrupted and the line is not error free, the following
message is displayed:
V.54 data loopback failed - check for documented errors
If this message is displayed, contact your line provider for help.
If the local unit cannot transmit data at that particular time, the following
message is displayed, and you should try again later:
V.54 SCC Transmit failed
3
To stop the loopback test, enter:
SET -SYS V54Lback = STOP
4
If you want to enable V.54 detection so that a remote unit can initiate a
V.54 loopback test, enter:
SET -SYS V54Lback = YES
5
To disable V.54 detection, enter:
SET -SYS V54Lback = NO
Summary of Contents for NETBuilder SI
Page 6: ......
Page 22: ...22 CHAPTER 1 FEATURES AND SPECIFICATIONS...
Page 28: ...28 CHAPTER 2 USING THE BRIDGE ROUTER IN YOUR NETWORK...
Page 40: ...40 CHAPTER 3 INSTALLING THE HARDWARE...
Page 52: ...52 CHAPTER 4 INSTALLING OR REMOVING AN INTERFACE MODULE...
Page 78: ...78 CHAPTER 6 BASIC CONFIGURATION OF PORTS AND PATHS...
Page 100: ...100 CHAPTER 7 ADVANCED CONFIGURATION OF PORTS AND PATHS...
Page 120: ...120 CHAPTER 9 CUSTOMIZING YOUR SOFTWARE...
Page 150: ...150 APPENDIX A TROUBLESHOOTING...
Page 162: ...162 APPENDIX C SYNTAX CONVENTIONS...
Page 196: ...196 APPENDIX E PROVISIONING YOUR ISDN LINE...
Page 202: ......
Page 210: ...210 INDEX...
Page 212: ......