2N TELEKOMUNIKACE a.s., www.2n.cz
32/85
8.
9.
10.
11.
Place the intercom into the flush mounting box while introducing the cables.
Leave some of the cables inside the unit as a reserve and the rest under the
intercom bottom.
Insert the supplied screws in the side mounting holes making sure that they
penetrate into the flush mounting box nuts. Tighten all the screws properly. Tip:
The screw tightening sequence may affect the intercom position.
We recommend to seal the frame – wall gap with a silicone or another sealant to
avoid wall dampening as a result of water leakage.
Do not complete mounting until you have finished electrical installation.
Flush Mounting – Thermally Insulated Wall
What You Need:
Longer screws (depending on the thermal insulation thickness)
Hole: (112 x 220 x 70) mm
Cut out the thermal insulation layer using the template (the same as for classic brick
wall).
Summary of Contents for 01353-001
Page 1: ...www 2n cz 2N IP Safety Emergency IP Intercom Installation Manual Version 2 13 ...
Page 41: ...2N TELEKOMUNIKACE a s www 2n cz 41 85 2N IP Safety Connectors PCB Version 555v3 ...
Page 56: ...2N TELEKOMUNIKACE a s www 2n cz 56 85 OVP overvoltage protection ...
Page 73: ...2N TELEKOMUNIKACE a s www 2n cz 73 85 3 3 Downloads Software 2N Network Scanner ...
Page 77: ...2N TELEKOMUNIKACE a s www 2n cz 77 85 4 1 General drawings Surface mounting ...