P-660R-Tx v2 Series Support Notes
wan node index
1
wan node ippolicy
1
Apply to LAN Interface (Suppose we apply it to remote node
1
in the example):
lan index
1
Usage: index <1: main LAN| 2: IP Alias#1|3: IP Alias#2>
lan ippolicy
1
lan save
10. Using Call Scheduling
•
What is Call Scheduling?
Call scheduling enables the mechanism for the P-660R-Tx v2 to run the
remote node connection according to the pre-defined schedule. This feature is
just like the scheduler ina video recorder which records the program according
to the specified time. Users can apply at most 4 schedule sets in Remote Node.
The remote node configured with the schedule set could be "Forced On",
"Forced Down", "Enable Dial-On-Demand", or "Disable Dial-On-Demand" on
specified date and time.
•
How to configure a Call Scheduling?
You can configure a call scheduling in CLI
Suppose we want to edit a call schedule set like this:
Call Schedule Set #=
1
Set name=
Test
Active=
Yes
Start Date(yyyy-mm-dd)=
2005 - 12 - 27
How Often=
Once
Once:
Date(yyyy-mm-dd)=
2005 -12 -27
Start Time(hh:mm)=
12 : 00
Duration(hh:mm)=
16 : 00
Action= Enable
Dial-on-demand
This schedule example permits a demand call on the line on 12:00 a.m.,
2005-12-27. The maximum length of time this connection is allowed is 16
hours.
To implement this, we need to invoke the following command one by one:
58
All contents copyright © 2006 ZyXEL Communications Corporation.